Block 185 – Core & Shell – Austin, TX Construction Type: New Construction Construction Cost / Size: $200,000,000/770,000 SF Completion Date: 2021 Services: IT/Telecommunications, A/V, Wireless and Security Consulting Architect: STG Design Core and Shell design for a thirty-six (36) story office building of approximately 776,644 Rentable Square Feet (RSF). Levels B01 – B05 consists… Read more »
Anadarko Petroleum Corporation – The Woodlands,TX New Construction Construction Cost / Size: 1,400,000 SF Completion Date: TBD Services: IT/Telecommunications, A/V, Wireless and Security and Outside Plan design Architect: Gensler The two phase project is a state of the art vertical, mixed-use development containing approximately 1,400,000 sf. The project includes two, 35 story structures which will… Read more »
Parkway Central – Houston,TX New Construction Construction Cost / Size: Completion Date: 2013 Services: Interior surveillance, access control and security Architect: Powers Brown Architecture 4b Technology provided security design and consulting for the Parkway Central Office Building. This project consisted of security infrastructure and designs for a new office building, parking garage, two surface lots… Read more »
FMC Generation Park – Phase Two – Houston,TX New Construction Construction Cost / Size: 50 acres Completion Date: TBD Services: Outside Plant, Outdoor Wireless, and indoor DAS, Security, IT and A/V Architect: Gensler The new campus spans over 50 acres and is located in the Houston area. The project will include at least 420,000 SF… Read more »
DOW Chemical Middle East Innovation Center – Saudi Arabia New Construction Construction Cost / Size: 13,500 SF Completion Date: 2018 Services: Technology Infrastructure, Audio-visual and Security design Architect: Kirksey The Innovation Center located at King Abdullah University of Science & Technology (KAUST), Saudi Arabia consists of a new 13,500-square- meter Research and Development Center. The… Read more »
DOW Chemical Company World Headquarters Building – Midland, Michigan New Construction Construction Cost / Size: 6 story building Completion Date: 2017 Services: Technology Infrastructure, Audio-Visual and Security Design Architect: Kirksey Dow Chemical’s Corporate Headquarters in Midland, Michigan includes a new state-of-the-art, six-story building for approximately 600 to replace the current 2020 Willard H. Dow Center…. Read more »
Block 23 – Greenwater Development – Austin, TX New Construction Construction Cost / Size: 490,000 SF Completion Date: 2017 Services: Core and Shell and Security Consulting Architect: Gensler The sixteen level tower features 490,000 square feet of office space and 11,000 square feet of ground floor restaurant/retail space located in Austin, TX. Floor plates in… Read more »
INEOS Chocolate Bayou and Battleground -Texas Construction Type: New Construction Construction Cost / Size: 140,000 SF Completion Date: 2019 Services: IT/Telecommunications, A/V, Wireless and Security Consulting Architect: Jacobs Engineering The INEOS project will consist of two Administration buildings in two locations totaling approximately 140,000 SF. Both buildings will contain Administrative Space for adjacent manufacturing Plants;… Read more »
Academy Sports and Outdoors Corporate Headquarters- Houston Construction Type: Interiors Project Size: 200,000 sf Office Building; 6 Story Parking Garage. Services: IT/Telecom, Security, Audio Visual Systems and Infrastructure Architect: Kirksey Architects The interior build-out of the Environmental Resources Management (ERM) office located in City Center was designed to have a large open work plan area,… Read more »
Houston Area Safety Council Campus – Houston,TX Construction Type: New Construction Construction Cost: $10,000,000 Completion Date: 2014 Services: IT/Telecommunications, A/V, & Security Consulting Architect: Kirksey The LEED certified campus includes a 220 – seat auditorium with stadium seating, meeting spaces, computer labs with 650 workstations, multiple classrooms, distinct study areas, and parking for over 1,000… Read more »
Dow Chemical Company Texas Innovation Center Campus – Lake Jackson,TX Construction Type: New Construction Construction Cost: Undisclosed Completion Date: Under Construction Services: IT/Telecommunications, A/V, & Security Consulting Architect: Kirksey The new campus consists of 900,000 plus SQ FT of construction on 50 acres in Lake Jackson, Texas. The five building campus provides administrative, research, production… Read more »
Environmental Resources Management- Houston Construction Type: Interiors Project Size: 45,000 sf Services: IT/Telecom, Audio Visual Systems and Infrastructure Architect: STG Design The interior build-out of the Environmental Resources Management (ERM) office located in City Center was designed to have a large open work plan area, with 20 conference rooms, and one board room. The 45,000… Read more »